Exporting your Glint data: what comes out, what does not, and the setting you cannot change
Microsoft documents every one of these limits openly on Microsoft Learn. This page puts them in one place, in the order an exit needs them, with the one irreversible setting flagged first.








Microsoft’s wording is that raw survey responses are exportable for each new survey program. No API, no BI tool and no support ticket sits between you and the file.
Microsoft LearnLarger files take longer and arrive by email when ready, but the mechanism is a download rather than a data request, with no API and no support ticket in between.
Microsoft LearnSurvey Cycle ID, sent date, comments, comment topics, the sensitive-comment flag, and full question text rather than a UUID, plus any employee attributes your organization sends.
Microsoft LearnA rendered report is not the figures. The spreadsheet holds numbers another platform can read; the slide and the document do not. That distinction is the whole of report exports and raw exports.
Program Setup, Confidentiality section, Enable Raw Survey Response Export. Set Approved to NO first or you cannot switch it on. Closed cycles never change.
Survey Programs, Completed cycles, the ellipsis on the cycle row, Export Raw Survey Responses. Tick Cycle ID, sent date, comments and topics.
Those two types have no Completed cycles tab. Configuration, Survey programs, the Actions menu, then a start and end date.
The Attributes list is your one chance to carry demographics across. Anything left unticked is not in the file.
Invitees, respondents, response rate, average score and percent favorable, for up to three attributes at a time.
Blank surveys are excluded from the export and still counted in the portal. Record both figures while you can see both.
Rated, comment and suppression. Months from now this is the only thing that explains a missing group score.
Platform-level, applies to every deletion, and defaults to retaining responses. Check it before anyone processes a request.
A deleted record sits in a soft-deleted state for thirty days, then goes permanently. Any export covering those people happens first.
A PDF or a slide will not load into another platform. Expect to rebuild the numbers from the raw exports.
Microsoft holds the data while the subscription is active, so no clock is published. Work back from your contract end date.
The full Glint migration guide
Still deciding where to go? Our roundup of Glint alternatives compares the field. This page works the same whichever one you pick.
Sourced to Microsoft’s own public documentation.
Bring the files to a working session and we will walk through what carries across, what does not, and what your first cycle on a new platform looks like.
4.7 / 5 on G2